HOW A COMPACT FIBER UNIT IMPROVES INSTALLATION

Intermittent Bonded Ribbon Production Line Available For Sale

A specified speed of 600 m/min gives this equipment considerable production capacity for optical-fiber applications. Prospective buyers should confirm the achievable speed, machine setup, and required operating conditions directly with the manufacturer before proceeding.

Shanghai Weiye OFC supplies equipment designed specifically for producing rollable ribbons containing 12 or 16 fibers. Its product description presents the equipment’s capabilities, technical specifications, and included systems, providing U.S. buyers with a basis for comparing their equipment requirements.

Review the listed configuration in the product description, then contact the supplier about pricing, installation, and options specific to your project. Doing so can clarify which specifications and options are relevant to your facility and production objectives.

Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. provides its business address as 201 Minyi Road, Songjiang District, Shanghai. Consider the product listing a preliminary information source, and confirm up-to-date specifications and commercial terms with the supplier. A detailed quotation request can help advance your equipment evaluation.




Key Takeaways

  • The stated operating speed is 600 m/min, although the manufacturer should confirm the applicable conditions.
  • The machinery is intended to manufacture rollable ribbons containing 12 or 16 fibers.
  • The product listing describes machine capabilities, technical specifications, and supplied systems.
  • Ask the supplier to clarify costs, installation arrangements, and requirements unique to your project.
  • A company address in Shanghai’s Songjiang District is included in the supplier information.

Overview Of The Intermittent Bonded Ribbon Production Line

According to the supplier, the equipment is designed for rollable IBR configurations containing 12 or 16 fibers. Its product page specifies a construction speed of 600 m/min and a fiber diameter of Ф245 μm ±10 μm. Because these figures represent stated machine specifications, buyers should verify achievable speeds and operating conditions with the manufacturer.

Intermittent Bonded Ribbon Production LineIntermittent Bonded Ribbon Production Line

Equipment Designed For Twelve- And Sixteen-Fiber Rollable Ribbon Production

Two fiber-count options are supported by the configuration for manufacturing rollable ribbons. This provides a useful reference when buyers compare machinery against their required ribbon format, fiber dimensions, and material-handling arrangements.

How Intermittent Bonding Supports Flexible Fiber Arrangement

According to examples in the patent, fibers are arranged in adjacent subunits with adhesive connections applied periodically. The patent provides an example of adhesive-bond intervals ranging between 10 mm and 1,000 mm. This differs from a continuously bonded structure in which the connection extends across the full ribbon length.

By spacing the bonds apart, the assembly can move between a mostly planar arrangement and a rolled, curled, or folded shape. These bond-spacing figures describe examples of the design approach and should not be interpreted as stated equipment settings.

  • Machine details: 12 or 16 fibers, a stated speed of 600 m/min, and a diameter of Ф245 μm ±10 μm.
  • Patent example: Adhesive-bond intervals ranging from 10 mm to 1,000 mm.
  • Design benefit: Adaptable handling when the ribbon takes different shapes.

Uses In Optical Fiber Cable Manufacturing

Flexible ribbon arrangements can help cable designers balance access for splicing with compact cable packaging. The patented design keeps fibers arranged in order while permitting sections between bonded points to shift as the cable is assembled.

High Fiber Density And Compact Cable Designs

For mass fusion splicing, an optical fiber ribbon can be arranged flat before being folded or rolled into a more compact cable. The patent identifies opportunities for reduced cable dimensions and a greater proportion of fiber area relative to the cable’s cross-sectional area. The results achieved in practice depend on the complete cable construction and its intended use.

Organizing Fiber Ribbons To Support Efficient Fusion Splicing

This design supports orderly fiber handling during splicing while providing flexibility for subunit movement in the assembly process. For production material planning, the listed specifications include payoff reels accommodating 25.2 km and 50.4 km of fiber. Buyers can evaluate these capacities against their production requirements and existing handling arrangements.

Design detail Possible application Consideration for buyers
Flat fiber configuration Fusion splicing of multiple fibers Confirm requirements for the splice workflow
Folded or rolled format Space-efficient cable packaging Examine the complete cable design
Payoff reels with capacities of 25.2 km and 50.4 km Planning material-handling operations Match the reel capacity to production operations

Specifications And Performance Of The Production Line

Before asking for pricing, assess whether the stated machine performance matches the demands of your production process. Installation preparations should also account for suitable reels and the utilities available at the production site.

Production Speed, Fiber Diameter, And Attenuation

The stated construction speed is 600 m/min. The listed fiber diameter is Ф245 μm ±10 μm, with additional attenuation of ≤0.01 dB/km measured at 1550 nm. Ask the supplier to verify the testing conditions and achievable results.

Compatibility With Payoff And Take-Up Reels

Two payoff reel sizes are offered, with each full reel limited to 10 kg. The take-up assembly supports a T-type reel as well as a fiber-optic reel. Check whether the preferred reel format suits your existing handling equipment and procedures.

Facility Utilities And Operating Environment

The machine requires a three-phase, five-wire electrical supply rated at 380 V ±10%. The equipment should operate in an enclosed, clean, dry, draft-free area maintained at 15 to 25°C and a maximum relative humidity of 85%. Utility requirements also include nitrogen at 7 bar and 99.99% purity, plus a compressed-air supply at 6 bar. Verify the required utility connections before installation begins.

Technical specification Listed requirement Installation planning note
Payoff reels Ф236 × Ф25.4 × 108 mm; Ф267 × Ф25.4 × 180 mm; maximum full-reel weight ≤10 kg Verify reel dimensions and weight
Reel used for take-up T-type dimensions of Φ410 × Φ50.8 × 391 mm, or a fiber-optic reel Verify the preferred reel format
Power and environment 380 V ±10%; 15 to 25°C; relative humidity ≤85% Provide a clean, dry area without drafts
Gas supply Nitrogen: 7 bar, 99.99% purity; air: 6 bar Verify gas supply capacity before installation

Equipment For Fiber Payoff And Gathering

Optical fibers are guided toward the forming section by the payoff and gathering components. The associated controls help maintain a steady supply of fiber while reducing handling risks.

Tension-Controlled Payoff System For Sixteen Spools

The payoff assembly holds 16 spools and provides traversing along with separately adjustable tension settings. The permitted weight for an individual spool is up to 10 kg. Detailed specifications indicate a tension range of 0.4 to 2 N, accuracy of ±0.02 N, and a 550 W motor. Another overview gives a range of 40 to 150 g and accuracy of ±2 g, so buyers should confirm which specification applies to their configuration.

Fiber Guiding, Break Detection, And Electrostatic Control

The forming area receives fibers through U-groove guides, multi-groove gathering rollers, and devices designed to prevent jumping. A break-detection system and alarms notify operators when problems occur. Safe handling is supported by protective guards and a pneumatic clamping mechanism. At the fiber exit, a rod-style electrostatic dust collector is installed, while anti-static equipment helps manage dust along the gathering route.

Component Specified details Purpose
Payoff Capacity for 16 spools, each weighing up to 10 kg Supplies fibers using traversing
Tension and motor Tension of 0.4 to 2 N, accuracy ±0.02 N; motor rated 550 W Maintains controlled fiber payoff
Fiber guidance and safety features Rollers with grooves, warning alarms, protective guards, and a pneumatic clamp Directs fibers and supports safe handling
Electrostatic management Rod-style electrostatic collector with anti-static devices Supports dust control along the fiber path

Precision Molding And Intermittent Adhesive Dispensing

Operators can adjust adhesive positioning and mold alignment through the forming platform. Available adjustments help configure the process for each required ribbon format.

Adjustable IBR Mold Platform For Ribbon Formation

Three mold sets are provided for ribbon formation, and each accommodates as many as five Nordson EFD jet valves. The mold adjustment range extends from 0 to 15 mm, while the mold base can be maintained between 20°C and 60°C. Precision valve groups mounted on sliding tables allow fine positioning and accurate application of adhesive dots.

Adjustable Nozzle Configurations For Twelve- And Sixteen-Fiber Ribbon Production

The 12-fiber configuration employs a 5+5+1 valve arrangement. The 16-fiber format is produced using a 5+5+5 valve layout. The control interface enables changes to dot count and spacing according to the ribbon configuration being manufactured. A dedicated adhesive is required for the coating and curing stages.

Process setting 12-Fiber Format 16-Fiber Format
Valve arrangement Valve arrangement of 5+5+1 Valve arrangement of 5+5+5
Mold adjustment 0 to 15 mm adjustment Adjustment range of 0 to 15 mm
Mold-base temperature 20°C to 60°C operating range Temperature range of 20°C to 60°C

Curing Bonded Fiber Ribbons With UV-LED Technology

Adhesive across the fiber assembly is cured through a sequence of UV exposure stages. Prospective buyers can assess the oven configuration and listed operating specifications to determine whether the equipment suits their production process.

Initial Pre-Curing And Main Curing Operations

Three dedicated LED-UV ovens rated at 800 W each perform the pre-curing operation. Each oven processes fibers supplied by a separate mold group before the material reaches the main 6 kW post-curing oven. Adjustable shutters reduce potential UV leakage and nitrogen loss. Published specifications identify a dominant wavelength of 395 nm ±3 nm, a curing degree of at least 85%, and post-curing power of at least 2.5 kW.

Managing Nitrogen Supply And Curing Performance

Operators can manually regulate nitrogen pressure and flow. The system additionally switches nitrogen on when starting and off when shutting down. At production speed under continuous stable conditions, the specified lamp-array power consumption is no more than 80% of total power. The figures are useful for initial equipment assessment, but buyers should confirm the conditions under which they were measured. Ask whether different adhesives or materials require adjustments to the settings.

Visual Monitoring, Capstan, And Take-Up

As fibers travel through the equipment, visual monitoring and steady winding support the maintenance of material quality. The published operating settings also offer buyers useful criteria for comparing equipment against their cable production requirements.

Real-Time Inspection Of Fiber Colors And Adhesive Dot Placement

A microscope and camera provide enlarged images in real time. Operators can inspect optical-fiber color order and verify the presence of resin dots at individual dispensing locations. By examining the optical fiber ribbon during production, operators can detect potential issues ahead of winding.

Precision Take-Up With Servo-Controlled Traction

The Φ190 mm capstan traction wheel is driven by a 1 kW AC servo motor. Metering accuracy is specified as better than 1‰. Operators can set tension between 50 and 500 g while maintaining an accuracy of ±5 g. These operating parameters help maintain careful fiber-ribbon handling as the material advances through the line.

The specified take-up speed is 600 m/min, and the maximum spool weight is 30 kg. Servo-controlled winding and traversing systems help maintain consistent material placement. Cable pitch can be adjusted continuously between 1 and 6 mm. Position detection and direction changes are supported by a photoelectric sensor. Confirm that the operating conditions and settings are suitable for your target cable design with the supplier.

Production Monitoring And Electrical Control Systems

Clear control functions help production staff manage settings, monitor system conditions, and prepare smooth stopping procedures. According to the manufacturer, the machinery incorporates Siemens controls alongside Schneider Electric switchgear.

PLC And Touchscreen Operation

Siemens S7-1200 and S7-1500 PLCs manage the ribbon manufacturing system through a 10.4-inch Siemens touchscreen. Low-voltage switchgear is supplied by Schneider Electric. Operators may control the entire line with interlocked units or run individual sections independently.

Settings, Alarms, And Length-Based Stops

Through the touchscreen, operators can manage process settings, activate curing ovens, configure wire feeding, and view alarms. Additional displays provide lamp runtime, real-time current readings, curing-oven temperature, and total machine operating hours. A meter-counter correction function helps synchronize displayed length measurements with actual material movement.

Operators can program a target production length that triggers deceleration or shutdown. The function supports managed stopping as a cable manufacturing run reaches its planned length. Verify the available controls and configuration requirements with the supplier before purchasing.

Control-system feature Published specification Use
PLC and display Siemens S7-1200/S7-1500; 10.4-inch touchscreen Adjust and review operating information
Electrical control components Low-voltage switchgear from Schneider Electric Supports electrical control operations
Equipment monitoring and shutdown control Operating data for lamps, ovens, runtime, and meters; preset-length function Track operating conditions and initiate machine stopping or slowing

Materials, Process Compatibility, And Ribbon Quality

Adhesive selection affects both the consistency of coating application and the final product. Rather than recommending a general adhesive, the supplier specifies a formulation dedicated to the equipment’s coating and curing operations.

Specialized Adhesive Used For Bonding And Curing

Separate valve switches on the pressurized adhesive supply let operators control individual feed paths. Precision pressure-regulating valves help maintain controlled adhesive delivery at each dispensing location. The specified air pressure is adjustable, with a required minimum of 0.5 MPa.

Black adhesive supply tubing helps protect the material from reactions caused by UV exposure during operation and curing. This protection is important because premature exposure may change adhesive properties before application to the fiber.

Before selecting materials for a secondary coating line, verify adhesive compatibility, production settings, and required surface-quality standards with the supplier. Discuss the material’s expected performance across your planned application and run duration. Detailed manufacturing guidance can support consistent quality throughout setup and the completed run.

Equipment Installation Needs And Supplied Documentation

Ensure the workspace and utility supplies are ready before scheduling the machine’s installation. The manufacturer’s stated requirements help buyers prepare their facilities and maintain stable operation of the optical fiber equipment.

Facility Conditions And Buyer-Supplied Connections

Install the machinery in a clean, dry, enclosed environment protected from drafts. Keep the operating area between 15 and 25°C, with humidity at or below 85%. The installation also requires nitrogen supplied at 7 bar with 99.99% purity and an air supply rated at 6 bar.

Connection cables and cable trays are excluded from the supplied equipment. The purchaser is responsible for supplying the main incoming power cable. Before installation, check cable routing and utility capacity, particularly when the machine will be located near secondary coating operations.

Documentation For Operation, Installation, And Maintenance

Documents covering installation, equipment use, and maintenance are provided by the manufacturer. Inspect the supplied documentation before commissioning so personnel can organize tasks and obtain required materials.

  • Operating and instruction manuals together with the overall equipment layout drawing
  • Wiring and electrical schematic diagrams, plus installation and maintenance drawings
  • Manuals for purchased parts and a list of wear parts for maintenance planning

These documents help maintenance and production teams prepare for initial startup and regular equipment care.

Selecting A Ribbon Production Line That Matches Your Manufacturing Requirements

First determine which finished ribbon products your business plans to offer. This production line is designed for 12F and 16F options, with a listed construction rate of 600 m/min. Assess the stated capabilities against your planned range of products, throughput requirements, and projected cable orders.

Verify take-up reel compatibility before placing an equipment order. The standard IBR reel has dimensions of Φ410 × Φ50.8 × 390 × Φ310 mm, supports up to 30 kg, and provides cable pitch adjustment from 1 to 6 mm. Check that these specifications suit your production facility and material-handling operations.

The compatibility of payoff spools should be reviewed as well. The listed choices include internationally standardized spools with capacities of 25.2 km, 50.4 km, and 63 km. Obtain the exact spool dimensions before ordering materials or planning the length of manufacturing runs.

In addition to speed, consider power and gas utilities, suitable adhesives, and the available monitoring functions. For cable manufacturing, determine whether the configuration suits fiber cable, loose tube, or another planned application. Before ordering, review equipment configuration and startup requirements directly with Shanghai Weiye. Checking equipment suitability in advance can reduce the likelihood of costly changes after purchase.

Planning point Manufacturer-listed specification Required buyer verification
Ribbon configurations and operating speed 12F, 16F; specified speed of 600 m/min Compare with target production and product mix
Take-up Maximum 30 kg; cable pitch of 1 to 6 mm Check reel compatibility and facility requirements
Fiber payoff reel options Capacities of 25.2 km, 50.4 km, and 63 km Verify exact spool dimensions

How To Request A Quotation For The Intermittent Bonded Ribbon Production Line

For U.S. manufacturers, the equipment provides 12F and 16F configurations, a listed construction speed of 600 m/min, and dedicated machinery for forming optical fiber ribbons. Use these specifications to determine whether the machine is appropriate for your intended cable application.

When requesting a quotation, provide the required ribbon format, expected output volume, preferred reels, and available site utilities. Include information about the fibers and material-handling process to allow Shanghai Weiye to review the intended setup.

Confirm the suitability of the adhesive, the LED wavelength specification of 395 nm ±3 nm, and expected curing results before purchasing. Ask the supplier how these parameters relate to the chosen materials and required surface quality.

Use the manufacturer’s product listing to examine the equipment information. Verify the final configuration, shipment details, and installation commissioning with Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. The company’s listed address is 201 Minyi Road, Songjiang District, Shanghai. You can call 021-60701630 to review your project needs with the supplier. A detailed quotation inquiry helps define the next steps in purchasing.